<?xml version="1.0" encoding="utf-8"?>
	<rss version="2.0">
		<channel>
			<title>Green Building Forum - closing crawl space and VOC</title>
			<lastBuildDate>Fri, 14 Aug 2026 23:00:11 +0100</lastBuildDate>
			<link>https://www.greenbuildingforum.co.uk/newforum/</link>
			<description></description>
			<generator>Lussumo Vanilla 1.0.3</generator>
			<item>
		<title>closing crawl space and VOC</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12172#Comment_12172</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12172#Comment_12172</guid>
		<pubDate>Wed, 09 Jan 2008 23:35:48 +0000</pubDate>
		<author>mbartosik</author>
		<description>
			<![CDATA[hi, this is my first post. I'm a Brit in New York, and getting close to net zero energy for my 1963 house.<br />As part of my project I've closed a crawl space.<br /><br />Here is what I've done:<br />  Close crawl space vents.<br />  Insulate crawl space walls with 2" R10 foam board (will add one more layer later).<br />  Covered dirt floor with plastic.<br /><br />Now here's my problem, rather than using 6 mil polythene to cover the dirt floor, I was bothered of tears, so I put down a pool mat and then a 20 mil pool liner. The trouble is that the pool liner is vinyl and off gases.<br /><br />So to avoid the off gassing I could:<br />1) Rip out the vinyl liner and replace with polyethene? -- a big waste, and I've glued it to the insulation (with low VOC glue)<br />2) Cover / seal liner with a layer of polyethene.<br />3) Cover liner with thin concrete slab (I only have 24" height, so a max 2" slab / cap)<br />4) Vent the crawl space using the energy recovery ventilator that I already have (just fit an extra 4" duct).<br />5) Combination of above.<br />6) Wait and hope that off gassing reduces.<br /><br />I could do a combination, like 2 then 3, and 4.<br /><br />If I add a thin concrete slab (it does not need to take a load) then how thin could I get away with, and how thick insulation should I use under it. I'm thinking about 1.5" of concrete with some re-enforcing. Remember I've only got 24" total height.<br /><br />Any advice please??<br /><br /><br />FYI: to get to net zero, so far I have 13KW of PV, 2 stage ground source heat pump, window upgrades next month (www.apleninc.com - mostly fiber glass), upgraded insulation, still to replace doors, and insulate basement. So far I'm able to cover my energy usage for 10 out of 12 months including heating. Also crawlspaces.org is useful for tips.]]>
		</description>
	</item>
	<item>
		<title>closing crawl space and VOC</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12177#Comment_12177</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12177#Comment_12177</guid>
		<pubDate>Thu, 10 Jan 2008 07:56:00 +0000</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[The off gassing will only last a short time. My advice would be to fit the fan. I am concerned about you closing the vents anyway as the area should/will need to ventilated. <br /><br />Thermally it sounds like the crawl space is inside your thermal barrier? is there any insulation between it and the house?    So I  go for 4 & 6<br /><br />Sounds like a fantastic job that you have done to the house!]]>
		</description>
	</item>
	<item>
		<title>closing crawl space and VOC</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12208#Comment_12208</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=1076&amp;Focus=12208#Comment_12208</guid>
		<pubDate>Thu, 10 Jan 2008 18:15:06 +0000</pubDate>
		<author>mbartosik</author>
		<description>
			<![CDATA[Tony, thanks<br /><br />The crawl space is now opened to the house basement (conditioned space). So one could considered it vented to the inside of the house. It is within the thermal barrier. No insulation between it and the house.<br /><br />I'll do as you advise. What I need is about 1 gallon of patience, but I haven't found anywhere that stocks that ;-)<br />The vinyl has been in there for about 3 weeks, and the smell is definitely less, I'll fit the duct to forcibly ventilate via the energy recovery ventilator and reassess it in a few months.]]>
		</description>
	</item>
	
		</channel>
	</rss>