<?xml version="1.0" encoding="utf-8"?>
	<rss version="2.0">
		<channel>
			<title>Green Building Forum - Transition detail - blockwork to timber frame</title>
			<lastBuildDate>Sun, 31 May 2026 00:09:41 +0100</lastBuildDate>
			<link>https://www.greenbuildingforum.co.uk/newforum/</link>
			<description></description>
			<generator>Lussumo Vanilla 1.0.3</generator>
			<item>
		<title>Transition detail - blockwork to timber frame</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=12253&amp;Focus=204316#Comment_204316</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=12253&amp;Focus=204316#Comment_204316</guid>
		<pubDate>Wed, 25 Jun 2014 06:54:56 +0100</pubDate>
		<author>Triassic</author>
		<description>
			<![CDATA[So we have a design for out basement - blockwork with a waterproof coating on the outside and insulation and plaster board on the inside (options discussed here  <a href="http://www.greenbuildingforum.co.uk/forum114/comments.php?DiscussionID=12177&page=1#Item_20" target="_self" rel="nofollow">http://www.greenbuildingforum.co.uk/forum114/comments.php?DiscussionID=12177&page=1#Item_20</a>).<br /><br />Next I need to sit the Timber Frame in top of the blockwork and ensure the insulation is continuous and eliminating any thermal bridging, anyone got any suggestions or detail drawings how this could be achieved?]]>
		</description>
	</item>
	
		</channel>
	</rss>