Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




    • CommentAuthorKenny_M
    • CommentTimeAug 23rd 2019
     
    I've mentioned my extension refurb plans/confusion on other threads, but I now have building warrant and I am pulling the trigger on order of Russell Timbertech, Timber framed triple glazed sliding doors (u=0.7) and windows (u=0.9). As mentioned before I've struggled to get builders/joiners that are competent, willing and available, so long story short I am on my own with this, with a large pinch of figuring it out as I go along.

    I feel like I have a reasonable quote from Russell, and it looks like a decent quality product, but communication with them hasn't been the best, and I thought I might be better to just to see if anyone on here has installed their sliding doors and windows before?

    Basically, what I am trying to find out is how they are installed, in case I need to take anything into account for the final measurements. The installation instructions seem to infer that there are pre-drilled holes through the frame, but its not clear if they are pre-drilled or if you have to drill them and I can't seem to get any clarity from them on this. Its important for me because the doors will be 145mm in section, while the timber corner post and lintel that they will fix to are only 150mm and ~110mm respectively, so I need to have an idea where the screws will go in case they are going to come through somewhere where there is nothing to fix them to. For example, the post seems to line up with the inner leaf/cavity, so it looks like the window will end up part way across the cavity and mostly on the inner leaf, but if there are screw holes and they come through into the cavity, or they come up an miss the lintel, then I need to account for that in advance.

    I am presuming in all of this that timber doors and windows are installed in much the same way as uPVC, i.e screw them in place with packers at the screw locations and then fill any gap with low expansion expanding foam? Or is there a better way?

    Sorry of the rambling post, hope it makes sense, and if anyone has fitted these before I'd appreciate any insight.
    • CommentAuthorGreenPaddy
    • CommentTimeAug 23rd 2019
     
    I've used them a couple of times, and always had good quality at a really good price. I find their quotation spreadsheets a bit messy to read, but that's just me.

    I would always fix st/steel brackets to the "unseen" face of the frames, and then fix those brackets to the substrate, be that block, or normally timber frame.

    In your case, if I understood your description, you're flush with the inner leaf face, so use an "L" bracket, that would then stick out from the window/door frame towards the wall. Push the window/door outwards, till the "L" brackets catch, and then fix.

    What is in the cavity? Fire checks? Is the build in timber frame, or block? Some "old school" building timber frame screw the 50x50 fire checks to the window frames, set in the window, then fix the fire checks to the timber frame opening.

    Think about the exterior and interior reveals, how they are close to the window/door frames, and Russ TT window cill depth, which will determine exactly where the window/door units should sit within the wall construction.
    • CommentAuthorKenny_M
    • CommentTimeAug 23rd 2019
     
    Thanks very much GreenPaddy.

    Do you mean this sort of thing? - https://www.screwfix.com/p/sabrefix-heavy-duty-angle-brackets-galvanised-40-x-60mm-25-pack/71671

    Right. That actually sounds quite good and will probably help with fitting as one door is apparently 230kg. No need for packers then, just make sure its going on to a level surface at the threshold, move into place and screw to the wall on one side and the post on the other, then fill the gap. I'd imagine some spacers under the brackets if needed to ensure it is straight up and down.

    Its actually brick inner and outer leaf on one side of the door, with blown in EPS cavity insulation. Not sure how it is closed. On the other side where the window meets the corner it is a timber post. The timber post is currently on top of a dwarf wall, but I am removing the wall and replacing with a full length timber post (currently windows and wall being cut out to fit doors). The timber lintel appears to be two 50x200 pieces, with about 10mm gap in the middle so about 110mm depth. This looks like it is suspended at the top of the cavity on the wall side and sits on top of the timber post at the other side. My amateurish drawing attached might explain this better.

    If using brackets that is handy as I could just fit a bracket deeper in on the door to account for the fact that the lintel position is further in, and then put insulation and plasterboard over the timber lintel from the inside to hide the bracket.

    The other door, which runs from in the adjacent to the first door from the timber post, has what appears to be solid block on the other side, and a narrower single 50mm thick lintel (not really carrying any weight), so again the brackets would help as I can position them on the frame appropriately.

    djh mentioned brackets on another thread but I didn't really click as to what was meant until now.

    Not completely sure what you mean by this part "Think about the exterior and interior reveals, how they are close to the window/door frames, and Russ TT window cill depth, which will determine exactly where the window/door units should sit within the wall construction.", but the window cill is one thing I am trying to get details on from them. We currently have concrete cills, and were thinking of keeping these and maybe somehow cutting the cill on the inside at the cavity to thermally break, but not sure if the window can come without a cill. The windows are a more straightforward proposition as it is masonry all around. I am presuming that inner leaf is the best position as for various reasons our insulation will all have to be internal. According to the guys who did the cavity insulation the bit where the windows are (kitchen and utility room) are solid block.
    •  
      CommentAuthordjh
    • CommentTimeAug 23rd 2019
     
    Posted By: Kenny_MRight. That actually sounds quite good and will probably help with fitting as one door is apparently 230kg. No need for packers then, just make sure its going on to a level surface at the threshold, move into place and screw to the wall on one side and the post on the other, then fill the gap. I'd imagine some spacers under the brackets if needed to ensure it is straight up and down.

    Sliding doors are completely different to normal doors if they are bottom-rolling. With a normal door there is no weight on the threshold except live weight of people using the door. With a bottom-rolling door the entire weight of the door is on the threshold and the sides just hold it vertical. In that case, it is extremely important that the surface under the door is exactly flat. It doesn't take very much at all to make the door jump off its track. (Don't ask me how I know this :shamed: )

    230 kg is very heavy. Make sure you have planned the complete access route from wherever it is offloaded from the lorry to the installed position. Make sure you have enough people on hand to lift it, and sufficient glass suckers etc. And do a dress rehearsal to make sure you have all the necessary tools and fixings close to hand. Oh, and make sure you have double-checked your calculations of the height of the flat area the door will rest on versus finished floor height.
    • CommentAuthorKenny_M
    • CommentTimeAug 24th 2019
     
    Thanks for this djh.

    I'm presuming that the weight is on the bottom. They don't specify this but from the drawing it looks like the roller is on the bottom. I am thinking of taking the wall down below floor level, then pouring or skimming the wall at that part so I have a perfectly level surface. I was also thinking of building it up from there to the required level with compact foam (as suggested on another thread). The recommended stress for compact foam is 1.01 N/mm2, and if I have my calcs right this is 2940x145x1.01=430563=430kN~4300kg, so should be well able for this door. They have just told me that they have discontinued the hardwood threshold I had spec'd and it is a low level threshold now so will need to be positioned not much lower than finished floor level. I am planning to raise the floor level with insulation so I need to factor all this in with the measurements.

    Due to the time I have I am going to have to prepare the opening etc while I am off in later September, then close it up temporarily until the doors arrive. My plan is to have people over to help me in with the delivery and bring the door inside, then prep everything, get brackets on, then get some people back over to help lift in place a couple of days later.

    I have a couple of glass suckers, but hadn't thought I would need these. I got the impression that the door was to be lifted by the door jambs only. Am I missing something here?

    I know this might be a daft question, but any recommendations of how many people to lift? I've got to get it up a couple of steps then about 30m to the back of the house. I was working on the impression that 320kG was about the weight of an old cast iron inside upright piano, which I have moved before with two people, but in this case due to the height and tip risk I was thinking to have an extra one or two people to each side to steady. Does that sound like enough?
  1.  
    For moving stuff around I never plan more than 50kg per person - assuming they are reasonably fit. Bags of cement were reduced from 50kg to 25kg for a reason!

    I would advise using webbing straps passed under the door with a person on each end of the strap with knots or loops (aka hand holds) tied at a comfortable length to give ground clearance.

    Glass suckers are good for keeping balance but unless I was very sure of their good condition I wouldn't risk carrying the door with suckers only. Use the suckers for final positioning.
    • CommentAuthorowlman
    • CommentTimeAug 24th 2019 edited
     
    Recently I fitted two fold and slide doors 1@ 4M and 1@ 3M and I echo what djh says regarding leveling.
    Both these doors were combination top hung/bottom rolling and with adjustment. Nevertheless I took great care in calculating FFL especially the 4M one, as it separated the living room from the sun-room and I didn't want any sort of FFL difference. I also had to ensure the bottom track sub-base and the overhead Glulam beams were perfectly parallel, I would think this will be important to you too.
    I can't answer for your compact foam because I put in a steel box section base on the room divider doors with the supplied track sitting on it. Having a full length and true, rigid, sub base helps with leveling. The smaller exterior door is sitting on brick.
    What PiH says is right, use webbing straps under large heavy sections with someone at each side, and someone else keeping the whole job vertical. It's a method I've used frequently for large glazing, I use 80mm wide webbing.
    • CommentAuthorKenny_M
    • CommentTimeAug 25th 2019
     
    Thanks Peter/Owlman,

    I will hopefully have more info about the doors/delivery/packaging next week now that the order is confirmed and it is going through to production. RT seem to have been unwilling to let me talk to tech support until the order was confirmed, but I've been told there will be contact details

    I have a hope that their mechanical off lift is by crane and if so might be able to get it lowered over the garden wall at the back, which would be about a metre away. Wishful thinking probably. Straps are a good idea. Was also thinking of rigging up some sort of dolly. Should be able to get 4 guys together, and a spotter. My biggest problem will probably be the steps at the front if it can't be dropped off above them. Might even look into doing collection instead of paying for delivery to give me a bit of control over all of this.

    The compactfoam was a suggestion on another thread. Might ditch this and just skim the top of the cut down bricks to level. I have time to sort all of this out before the doors arrive as I will need to do all the prep while I am on holiday end Sept, then box up for a couple of weeks till doors arrive. Floor levels should be easy enough as it is raised on the outside anyway, and finished level on the inside is going to be built up with insulation and I can vary this as necessary.

    Thanks for all the support. I'm sure I will have more questions when I get to the next stage!
    • CommentAuthorowlman
    • CommentTimeAug 25th 2019
     
    I've never dealt with RT but their credentials and workmanship seem to come with high praise on this site. I can't say if that's justified or not. As an a outside observer however, and one who's been in the interior re-fit and re-furb business for many years and a qualified cabinet maker, and having dealt with 100s of companies over the years , they wouldn't have got past first base with me.
    I looked on their website and I couldn't find tech drawings or timber sections or details of running gear etc. etc.. I looked through downloads and if they are there, then they aren't easily found. it's one of the first things I look for.
    It could be my ineptitude on the computer, but some companies do give tech specs etc and if they don't then warning bells ring with me. It could be that they change hardware suppliers regularly and are unable to commit to drawings which leaves you a bit adrift with checking suitability.
    There are 100s of small companies with facilities for window manufacture and lots of them use the same spindle moulder tooling and same widely available laminated timber, likewise hardware, so why not supply drawings online,- strange, IMO.
  2.  
    Compacfoam seemed to work well for 2 x Rationel sliding doors, one c 2m and one c 3m.
    • CommentAuthorKenny_M
    • CommentTimeAug 26th 2019
     
    Owlman - I've been frustrated by this aspect of RT too. Not having experience in this area I just presumed that was how things worked in this industry, but I have since found other companies websites who have a multitude of drawings/installation info, even videos etc freely available for download.

    Not having experience fitting doors and windows it was even more critical that I had drawings, as I figured that with drawings my experience as an engineer, general info available online and the knowledge and support from GB forum site I would be able to muddle through. As it stands I have an order that references a ~40mm hardwood threshold, an email that says this is discontinued and they now only do 19mm thresholds, and a drawing attached to same email that seems to indicate the threshold is actually 27mm, and I obviously can't even finalise dimensions until I know which it is, and there are a few questions about the windows that are also holding out finalising dimensions.

    To be honest its hard to even get a decent picture of the products online and we had to visit their showroom to satisfy us with that aspect. My impression is that they are just an old fashioned company that haven't completely caught up with the idea of having an online presence but I am hoping that now that I have paid I will have better access to technical/production, to finalise the details, otherwise I'm in trouble! :)


    Nick - thanks for that, that's reassuring. I'm considering using this, but as the room concerned is raised with respect to ground level I am now starting to think that going for the extended cill and running perimeter insulation all around might be the better option. Good to have options.
    • CommentAuthorowlman
    • CommentTimeAug 26th 2019
     
    You may have already done this but in your situation I'd reiterate overall dims. with whatever tolerances you think fit, (e.g. +/- 5mm ).
    in the case of the sliding doors especially, but windows too, I'd also ask for small off cuts ( 1") samples of actual threshold and frame sections, door rails plus any off cut top and bottom running gear. Offer to pay postage.
    Reading again your OP. ask for frames to be un-drilled, on site drilling to suit is easy, you can even counter-bore the holes and wood plug them afterwards, for a better finish.
    If the Sliding door frames are supplied un-assembled ask if they are pre-jointed or just loose lengths.
    Are the doors supplied pre-glazed, if there is a choice let them do it.
    Do they assemble and check etc. before disassembly and shipping, good firms do.
    Ask what provision is made for water drainage, if needed, from the running gear bottom track. Is it just a slanting holes to the underside of the cill and if so, are they lined e.g. an alloy tube. If the roller track is surface mounted on top of the threshold they may not be needed, but some are recessed.
    Is there adjustment on the bottom rollers.
    What is the top guide like, does that also have any adjustment.
    What weatherstripping do they use where one leaf passes another, if it's brush pile is it replaceable,i.e. inset into a small alloy carrier, where in future it can be pulled out an a new one inserted.
    How does that work with the bottom ( presumably projecting, water drip, glazing bead )
    Do they use wood or alloy glazing beads, especially bottom, is there a choice.
    In the joinery trade I've seen pre-formed heavy duty solid plastic thresholds/cills instead of wood, do they offer that option.
    Do you need extra labour to assist offloading upon delivery. If its a third party haulage company it'll most likely just be the driver.

    Sorry to sound pedantic, but put that lot in writing, plus anything else that may trouble you.
    • CommentAuthorKenny_M
    • CommentTimeAug 26th 2019
     
    Thanks Owlman. Good tips, appreciate it, i'll look into this. I know the answer to some of this; for example i've been told its an aluminium/painted pine low level threshold, and I know that the adjustment is on the bottom roller, although the fact that the installation guide directs you to only adjust that one would indicate there is another adjustment. Their date sheet states "aluminium vented bottom bead". I have some drawings now so I can look over and see what I can gather about the other stuff.

    They have told me that everything comes fully assembled except for the ironmongery, hence the 230kG weight of the largest door. Unless I can get specific details and assurances I plan to ask if I can collect and get them to load into the van. This would probably be the better option for me as I can reverse a van with a tail-lift right into my drive and use the tail lift to take the front steps out of the equation. I can also collect them on a Friday and leave them in the van until a time at the weekend that suits to get enough bodies together to unload and install, with everything prep'd in advance.
Add your comments

    Username Password
  • Format comments as
 
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press