<?xml version="1.0" encoding="utf-8"?>
	<rss version="2.0">
		<channel>
			<title>Green Building Forum - Which tape to use between metal framing and the VCL on a ceiling?</title>
			<lastBuildDate>Thu, 19 Nov 2026 05:04:12 +0000</lastBuildDate>
			<link>https://www.greenbuildingforum.co.uk/newforum/</link>
			<description></description>
			<generator>Lussumo Vanilla 1.0.3</generator>
			<item>
		<title>Which tape to use between metal framing and the VCL on a ceiling?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311838#Comment_311838</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311838#Comment_311838</guid>
		<pubDate>Sat, 14 Nov 2026 14:36:01 +0000</pubDate>
		<author>Peter_in_Hungary</author>
		<description>
			<![CDATA[I am putting up a plasterboard ceiling using metal framing. The VCL will be sandwiched between the PB and the metal framing with the VCL stuck to the framing then the PB screwed in place.<br /><br />Does there need to be a sealing type of double-sided tape to seal the screws or will the screws pull together the PB and the framing sufficiently to prevent leakage so that any type of generic 2 sided tape will do?]]>
		</description>
	</item>
	<item>
		<title>Which tape to use between metal framing and the VCL on a ceiling?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311839#Comment_311839</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311839#Comment_311839</guid>
		<pubDate>Sat, 14 Nov 2026 15:15:30 +0000</pubDate>
		<author>build4less</author>
		<description>
			<![CDATA[Declaring an interest: we're Build4less, a building materials supplier.<br /><br />Peter, the screws clamping the board to the flange do most of the sealing at each fixing, and for vapour diffusion a few hundred small screw holes make very little difference. What matters far more for a VCL is air leakage, and that happens at the laps, the perimeter and anything that punches through it.<br /><br />So for the tape on the framing, its main job is holding the membrane flat and taut while you board. A generic foam or acrylic double sided tape will do that, but it can lose grip on cold steel and won't seal anything. If the VCL is also your airtightness layer and you're chasing a good test result, a butyl based double sided tape is worth the small extra cost, as it stays tacky and squeezes round the screw shank, a bit like nail sealing tape under counter battens.<br /><br />The bits I'd spend the effort on:<br />Laps of at least 100mm sealed with a proper airtightness tape compatible with the membrane, not on the framing line.<br />Perimeter dressed down the walls and sealed with membrane adhesive or tape to the plaster or parge coat.<br />Grommets or collars for any cables and pipes.<br />If you can, an extra layer of furring channel below the VCL as a service void, so downlights and cables never pierce it.]]>
		</description>
	</item>
	<item>
		<title>Which tape to use between metal framing and the VCL on a ceiling?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311840#Comment_311840</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311840#Comment_311840</guid>
		<pubDate>Sat, 14 Nov 2026 16:29:45 +0000</pubDate>
		<author>Peter_in_Hungary</author>
		<description>
			<![CDATA[Hi<br />Thanks for that. I'm not chasing an airtightness test. (Not required here and only done here for passive house certification)<br />I don't have much faith in the long-term stick-ability of tapes so I tend to avoid them if possible so the plan is to use a one piece VCL which should be possible with rooms 3.6M wide.<br />Lighting cables will be between the VCL and the PB. The only intentional damage planned to the VCL will be the bathroom extraction vent]]>
		</description>
	</item>
	<item>
		<title>Which tape to use between metal framing and the VCL on a ceiling?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311841#Comment_311841</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311841#Comment_311841</guid>
		<pubDate>Sat, 14 Nov 2026 17:09:14 +0000</pubDate>
		<author>djh</author>
		<description>
			<![CDATA[FWIW, I used lengths of double-sided butyl tape to seal screw holes through our airtightness layer where they had to be made structurally.We got a good airtightness result.]]>
		</description>
	</item>
	<item>
		<title>Which tape to use between metal framing and the VCL on a ceiling?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311842#Comment_311842</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=18503&amp;Focus=311842#Comment_311842</guid>
		<pubDate>Sat, 14 Nov 2026 17:20:23 +0000</pubDate>
		<author>build4less</author>
		<description>
			<![CDATA[Declaring an interest: we're Build4less, a building materials supplier. Makes sense, Peter. A one piece sheet at 3.6m wide takes away most of the risk, so the jobs left are the perimeter and the extract vent. At the walls I'd leave enough spare to turn the membrane down and either trap it behind the board edge or bed it in a bead of membrane adhesive, rather than relying on tape. For the extract, a preformed collar or grommet sized to the duct does the job with little or no tape: cross cut the VCL, push the duct through and fit the collar over it. It's also worth putting a noggin or a short length of channel round the vent opening so the fan and duct are supported without pulling on the membrane. And as djh says, butyl is the one tape I'd trust long term if you do need it anywhere.]]>
		</description>
	</item>
	
		</channel>
	</rss>