Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.




    • CommentAuthorgingernut
    • CommentTimeNov 15th 2007
     
    Wondering about putting in underfloor heating to heat my kitchen, which is in basement. The existing floor is concrete but is very dusty and worn into hollows in places, also some damp coming through... What would be the best way to proceed?
    From talking to friends - suggestions include - A.building new floor on top of existing (there is room to raise floor level by 200 mm) or B. Dig out floor with jackhammer and lay new floor to existing level.
    A. sounds easier, but can see that timbers ( including the stairs ) would have to be removed below new floor level, plus door , but this needs replacing anyway.
    I would like to use a lime-crete floor if possible.
    Hope this is rpeating a question already covered elsewhere
    Thanks
    • CommentAuthortony
    • CommentTimeNov 15th 2007
     
    1) Try to find out why the floor is damp and where this is coming from.

    2) break out floor and replace to the same finished level with pipes laid in it -- limecrete would be great.

    3) live happily ever after.
    • CommentAuthorgingernut
    • CommentTimeNov 15th 2007
     
    Thanks Tony,
    1) I think damp is probably coming from the road outside which is at ceiling level so some damp is prob inevitable, but the road is in poor state of repair and gulleys may not be working well .
    2) Ok
    3) will do my best
  1.  
    Place DPM on top of floor, use hilti or use double reinforcement mesh with UFH pipes tied to bottom mesh then screed with fibres to beef up
    You could also do the same using batten with a hard wood finish
    Any insulation you could include on top of DPM would be money well spent - success