<?xml version="1.0" encoding="utf-8"?>
	<rss version="2.0">
		<channel>
			<title>Green Building Forum - Renewable Energy</title>
			<lastBuildDate>Fri, 11 Sep 2026 23:27:47 +0100</lastBuildDate>
			<link>https://www.greenbuildingforum.co.uk/newforum/</link>
			<description></description>
			<generator>Lussumo Vanilla 1.0.3</generator>
			<item>
		<title>DIY LED Exterior lights...</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9665</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9665</guid>
		<pubDate>Sat, 06 Oct 2012 17:44:45 +0100</pubDate>
		<author>James Norton</author>
		<description>
			<![CDATA[I have a few places I was going to use exterior LED lighting:<br /><br />Over a front door<br />On a small balcony<br />On a deck / some steps<br /><br />You know the sort of thing, normally you'd have a couple of 100watt CFL jobs and 10 or so 30watt halogens that <br />kind of business...<br /><br />Now I know you can get off the shelf stuff, but I presume without 10 hours of blazing summer sun it will be an embarrassing disappointment.... therefore wondered about knocking up something a bit more hardcore...<br /><br />Say v.efficient low power LED light(s)<br />Decent PV panel (s)<br />Maybe a small wind generator<br />12v leisure battery<br />DC/DC constant current driver(s)<br />PIR / occupancy / day night control (to keep demand low)<br /><br />Any thoughts...?<br /><br />J]]>
		</description>
	</item>
	<item>
		<title>solar thermal: mixed flat plate and evacuated tube collectors</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9627</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9627</guid>
		<pubDate>Thu, 27 Sep 2012 01:03:01 +0100</pubDate>
		<author>Jeremy S</author>
		<description>
			<![CDATA[(trying to bump this by reposting here, rather than Heating and Cooling)<br />Hi,<br /><br />so, here's how I understand things:<br />1) evacuated tube collectors (ETC) maintain efficiency at higher inlet temperatures;<br />2) flat plate collectors (FPC) are more efficient at low inlet temperatures;<br />3) ETC are more expensive than FPC by both per joule and per sq_m.<br /><br />what's to stop us trying to optimise using the benefits of both in a mixed system?<br /><br />I'm thinking: 6-8sq_m of FPC in series with ~2sq_m of ETC.<br /><br />Is there any technical constraint that would prevent this being viable? (apparently the MCS certificate can't handle it but that's bureaucracy, eh?)<br /><br />best wishes - Jeremy]]>
		</description>
	</item>
	<item>
		<title>Can PV Solar make your grid meter run backwards!?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9546</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9546</guid>
		<pubDate>Sun, 09 Sep 2012 15:02:39 +0100</pubDate>
		<author>JTGreen</author>
		<description>
			<![CDATA[Just doing my meter readings for The Carbon Account, and my electricity meter is reading lower now than at the start of August.  Is it running backwards due to PV solar?  Surely that's not how it is meant to work?  (Since we also have generation meter for purpose of FiT.]]>
		</description>
	</item>
	<item>
		<title>PV on free standing domestic garage</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9606</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9606</guid>
		<pubDate>Sun, 23 Sep 2012 14:34:10 +0100</pubDate>
		<author>tychwarel</author>
		<description>
			<![CDATA[I have a domestic garage approx 6m from the house which at present has a flat steel sheet roof.<br />Its is also the best site for domestic PV, no overshading, existing electric spur from the house distribution board, easy access, etc<br /><br />What I would like to know is :-<br />1 would I require planning permission  to place PV units on this roof (free standing units designed for flat roof)<br />2 Would the fact that it is not integral to the dwelling influence the FIT rate.<br /><br />(I am in Wales if it makes any difference]]>
		</description>
	</item>
	<item>
		<title>Other wind generation</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9513</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9513</guid>
		<pubDate>Fri, 31 Aug 2012 09:13:47 +0100</pubDate>
		<author>MikeRumney</author>
		<description>
			<![CDATA[Anyone thought about, or come across, what I like to think of as an original idea that probably isn't!<br /><br />A "Treebine" ... Cable from a "Dynamo" on the ground to top of a wavy branch.<br /><br />(If you've seen a pole lathe in action you'll get this straight away.)<br /><br />Lots of variables I'm sure, and only just beginning to think about it, so all observations welcome (except "can't see it working" which never got anything built) :bigsmile:]]>
		</description>
	</item>
	<item>
		<title>Off-grid PV wiring, fuses etc</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9541</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9541</guid>
		<pubDate>Fri, 07 Sep 2012 15:19:13 +0100</pubDate>
		<author>Nick Parsons</author>
		<description>
			<![CDATA[Someone has just rung me to ask if I know a local (Sheffield) supplier of big fat DC cables and big fuses for an off-grid set-up. Not big - just to run his garage. It's only one panel, but I did not have the wit to ask what wattage!<br /><br />I don't, though I suggested that Navitron might be able to help. <br /><br />Anyone know of useful suppliers? Of course the supplier doesn't have to be Sheffield-based, as long as it's OK with mail order.<br /><br />Thanks for any help.<br /><br />Nick]]>
		</description>
	</item>
	<item>
		<title>Poorest performing Wind Turbine</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9499</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9499</guid>
		<pubDate>Mon, 27 Aug 2012 15:16:04 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[Which operational wind turbine in the UK produces the smallest amount of power compared to it rated output?]]>
		</description>
	</item>
	<item>
		<title>WHATS GRANTS ARE AVAILABLE IN THE UK</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=2364</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=2364</guid>
		<pubDate>Thu, 14 Aug 2008 14:47:18 +0100</pubDate>
		<author>TOTALPLUMBING</author>
		<description>
			<![CDATA[I HAVE A CUSTOMER WHO WANTS EITHER A WOOD PELLET BOILER OR A WOOD GASIFICATION BOILER FITTED. I AM NOT SURE OF THE GRANT SITUATION AND IF THERE IS A LARGER GRANT FOR THE PELLET MODEL DUE TO IT'S CARBON ADVANTAGES, CAN ANYONE HELP?<br /><br />I MAY ALSO HAVE TO LINK SOLAR TO THE SELECTED SYSTEM, IS THERE A SEPERATE GRANT FOR THAT?]]>
		</description>
	</item>
	<item>
		<title>Any downside to this offer?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8797</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8797</guid>
		<pubDate>Wed, 14 Mar 2012 11:10:36 +0000</pubDate>
		<author>Joiner</author>
		<description>
			<![CDATA[http://www.tecg.co.uk/domestic/solar-heating/solar-heating-panels.aspx]]>
		</description>
	</item>
	<item>
		<title>How good is your FIT supplier?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9409</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9409</guid>
		<pubDate>Thu, 02 Aug 2012 15:07:56 +0100</pubDate>
		<author>YouGen-Cathy</author>
		<description>
			<![CDATA[I reckon I get more complaints and questions about FIT suppliers (that's the energy company that administers your feed-in tariff) than any other thing. So I've set up a survey to try and find out what people really think of their FIT suppliers; what the problems are; and which ones are giving the best service. Its only 9 questions so will take a couple of minutes to reply (unless you choose to write an essay), and as a bribe, we'll put everyone who responds into a draw for an Amazon voucher. I'll also share the results with you all, to help newby microgenerators to pick a good one. The survey is here: http://www.surveymonkey.com/s/X6LFVMK]]>
		</description>
	</item>
	<item>
		<title>Â£75 FIT Data Processing Charge Introduction!</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9482</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9482</guid>
		<pubDate>Wed, 22 Aug 2012 11:13:25 +0100</pubDate>
		<author>SteveZ</author>
		<description>
			<![CDATA[Along with my latest FIT Levelisation (?) Invoice for the last quarter came a letter announcing the introduction from next March of a charge for actually processing the FIT claim. They say that since OFGEM have reduced their contribution towards the cost of processing these, my FIT licensee will have to charge Â£75 annually (index-linked) if I wish to stay with them.<br /><br />Has anyone else had anything similar or heard any rumours about OFGEM removing their subsidy?]]>
		</description>
	</item>
	<item>
		<title>Maximising solar PV utilisation</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8456</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8456</guid>
		<pubDate>Fri, 20 Jan 2012 18:35:18 +0000</pubDate>
		<author>Sprocket</author>
		<description>
			<![CDATA[ie. use it all instead of exporting it.<br /><br />I was sent some marketing blurb about a system from &quot;Cool Power Products&quot; called &quot;EMMA&quot; that automatically diverts all excess PV electricity to your immersion heater. It looks to cost about Â£1700 (which seems quite pricey to me given the pretty simple job it does). I'm not sure we're supposed to post links here but you'll find it if you Google it.<br /><br />It's of limited interest to me anyway since my PV is running my GSHPs and I will of course set timers so the GSHPs run when PV is most likely to be available. I did consider trying to do something smarter (our plant rooms are networked and I can read the PV output so the essentials are already there) but then that amounts to a similar thing anyway - making most use of the PV. Is that entirely ethical? I don't have an export meter so doesn't it mean my power provider would be overpaying me for presumed exports? Is that my problem or theirs?<br /><br />Anyway, I would be interested to know what folks in here think of the idea?]]>
		</description>
	</item>
	<item>
		<title>Wind turbines - liability insurance</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8400</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8400</guid>
		<pubDate>Thu, 12 Jan 2012 12:47:57 +0000</pubDate>
		<author>JSHarris</author>
		<description>
			<![CDATA[Had an interesting chat with a farming neighbour this morning.  For the past year or so he's been going through the process of getting PP for a big'ish wind turbine and hopes to get it installed this summer.  Yesterday he had a letter from his insurance company telling him they were changing the terms of his liability cover to exclude damage, death or injury caused by a wind power installation.<br /><br />It seems that the recent spate of blade and turbine failures may have put the wind up at least one insurance company.  It made me wonder whether or not people routinely inform their insurers of wind power installations or not, or even whether they need to.  Might be something to watch out for if you've got a wind turbine installation.]]>
		</description>
	</item>
	<item>
		<title>Biomass crops in the UK - BBC Farming Today mp3</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9418</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9418</guid>
		<pubDate>Sat, 04 Aug 2012 11:15:19 +0100</pubDate>
		<author>TimSmall</author>
		<description>
			<![CDATA[Today's episode of &quot;Farming Today&quot; was on Biomass crops - interesting I thought:<br /><br />http://downloads.bbc.co.uk/podcasts/radio4/farming/farming_20120804-0700a.mp3<br /><br />http://www.bbc.co.uk/podcasts/series/farming<br /><br />Tim.]]>
		</description>
	</item>
	<item>
		<title>Protecting battery chargers from overvoltage</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9419</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9419</guid>
		<pubDate>Sat, 04 Aug 2012 12:35:54 +0100</pubDate>
		<author>GBP-Keith</author>
		<description>
			<![CDATA[Does anyone know of a product or DIY solution that can protect regular 12v or 24v battery chargers from an overvoltage spike from renewables?<br /><br />Here is the scenario:<br />I have a 2.5 wind turbine and a number of other renewable technologies charging large battery banks. Some energy from some of my generators (hydro and some solar) is added to the batteries via simple chargers. However when the wind blows gusty (often with sunny weather) I occasionally get spikes up to 30volts or even slightly higher. This is OK to some degree as it helps equalize the batteries but I have found that it can  (and is) damaging some of the chargers. The automatic (3 stage) chargers seem more vulnerable as they seem unable to keep up with the rapidly changing voltages.<br /><br />I thought that some sort of blocking diode would be the answer but one charger manufacturer said that the charger will fail to see the batteries.<br /><br />Any ideas please- all suggestions welcome. <br />Cheers, Keith]]>
		</description>
	</item>
	<item>
		<title>Wake effects from large wind turbines?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9311</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9311</guid>
		<pubDate>Sun, 08 Jul 2012 11:22:16 +0100</pubDate>
		<author>windy lamb</author>
		<description>
			<![CDATA[I've just got wind of a possible application for an 800kW turbine on a field near me. Unfortunately, it is down (prevailing) wind from my Gaia 11kW wind turbine at around 600m-800m away. I think it is just a speculative scheme but will the wake effects of such a turbine either reduce the performance of the Gaia or even destroy it?<br />Any thoughts?. <br /><br />- I think my neighbours should be a bit more concerned than me because at least 6 of them are within 600m of it, 2 are 400m and I don't think turbulence will be their problem!  :shocked:]]>
		</description>
	</item>
	<item>
		<title>PV is cheaper than UK grid electricity ?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8081</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8081</guid>
		<pubDate>Sun, 06 Nov 2011 11:30:50 +0000</pubDate>
		<author>jamesingram</author>
		<description>
			<![CDATA[back of a fag packet maths<br /><br />4kW south facing system in UK , simple install inc vat Â£10,000<br /><br />estimated annual output  3,434 kWh/y<br /><br />25 year life of system , grid electric with no service charge 14p kWh<br /><br />25 x 3,434 = 85,850 kWh  x  14p = Â£12, 019    ( Â£10,302 if 12p kWh grid electric with service charge )<br /><br />So PV in the UK  is cheaper than grid electric if you can use or store this energy , whether you get /grants/FITs or not <br /><br />this doesn't take into account reduction in output of PV panels over time period ( 2-20% ), loss in potential alternative capital investment, grid electricity inflation, Pv system maintenance <br />and importantly ability to use and store all output .<br /><br />Ok you lot , let me know where I've got it wrong  :wink:]]>
		</description>
	</item>
	<item>
		<title>Permitted development rights WALES</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9300</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9300</guid>
		<pubDate>Thu, 05 Jul 2012 22:41:32 +0100</pubDate>
		<author>mondage</author>
		<description>
			<![CDATA[I live in a National Park (Pembrokeshire coastal) and have a flat roof with an 45cm Parapet.<br />I was informed by the planners 12 months ago that my 45 cm parapet was not the the plane of the roof and therefore I would need planning permission for my 16 panels (2 Thermal and 16PV (4Kw)).<br /><br />So upon finally deciding to embark on the pain of planning, imagine my glee when I discovered the new modifications to Permitted development for Wales (Sorry England)<br /><br />Flat roofs can have panels up to 1 metre above the deck.  <br /><br />Hurrah! no planning required....<br /><br />It was snuck under the radar on 18th June.<br /><br />http://origin-www.legislation.gov.uk/wsi/2012/1346/made<br /><br />Just thought the forum would like to know of the changes.]]>
		</description>
	</item>
	<item>
		<title>Can anyone point me towards next generation biofuel companies to fulfil a UK FTSE 100 buyer</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9281</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9281</guid>
		<pubDate>Tue, 03 Jul 2012 16:28:01 +0100</pubDate>
		<author>stephenmooney</author>
		<description>
			<![CDATA[We are looking for technologies that are 1-5 years from market readiness.  Total order volume would be in the region of 5 million litres/year.  Please feel free to contact me via the forum or directly at stephen.mooney@iveridis.com]]>
		</description>
	</item>
	<item>
		<title>Hydrogen &quot;storage&quot; for self-sufficiency via renewables?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9255</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9255</guid>
		<pubDate>Thu, 28 Jun 2012 12:09:35 +0100</pubDate>
		<author>Joiner</author>
		<description>
			<![CDATA[Furtling around looking for more info on the Fiat engine-based (Totem) CHP system and stumbled across this...<br /><br />http://www.esru.strath.ac.uk/Documents/MSc_2006/ete.pdf]]>
		</description>
	</item>
	<item>
		<title>VAWT - Vertical Axis Wind Turbines</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9246</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9246</guid>
		<pubDate>Mon, 25 Jun 2012 13:28:37 +0100</pubDate>
		<author>Joiner</author>
		<description>
			<![CDATA[Very little discussion about these machines recently, so to start the turbine turning after the prompt from Steamy Tea on another thread...<br /><br />http://www.youtube.com/watch?v=8MQaT9EbMDQ<br /><br />:bigsmile:]]>
		</description>
	</item>
	<item>
		<title>In my town</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9232</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9232</guid>
		<pubDate>Thu, 21 Jun 2012 19:37:30 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[What has happened in the last five years in my town?<br /><br />One large wind turbine, no hydro, some heat pumps, vast majority of electricity from fossil fuels, gas and oil prices rising fast.<br />Hybrid cars and busses, one electric car, less free parking, <br />Loads of wood burners, some larger wood and biomass installations in schools, businesses etc<br />Uptake of solar pv widespread but still only a tiny proportion.<br />Better insulation regulations for new buildings but this is not translating into as built results, poor air tightness, <br />Existing housing stock is poorly insulated, plenty of loft insulation going on, some cavity wall insulation, no floor insulation, no draught proofing or air sealing. Increase in energy poverty.<br />Waste recycling greatly improved<br />More interest in fruit and vegetable growing<br /><br /><br />What can we realistically expect to see by 2020?<br /><br />No more wind, lots more solar pv, may be hydro on the river, the grid itself will be greener<br />We will see more hybrid busses and cars, more electric cars, probably more cycling hopefully more car sharing and park and rides. Petrol and diesel will be very expensive. <br />The vast majority of electricity will still be generated from fossil fuels, gas and oil prices will be rising faster still and shortages of gas and oil will be seen.<br />New build will slowly improve in line with CSH nothing dramatic<br />The bulk of the existing housing stock will still be poorly insulated, draughty; energy hogging and even more people will be in energy poverty. We will see virtually no uptake of the Green deal. There will be an increase of insulation levels in roofs, some external and internal insulation wall insulation will be seen but this will only scratch the surface of what is needed, also we will see more draught proofing but we are unlikely to see any floor insulation. <br />We will see Smart Metering and consequent load shifting. (no overall saving of energy)<br />Waste recycling continuing to improve, more energy generated from waste.<br />We will see increased use of wood and biomass but also fully justified increasing resistance to its use and a widespread degradation in air quality that will become a much bigger problem.<br />We will see more examples of low energy projects, although district heating has been mooted I do not think that we will see this apart from possibly in high rise flats and these probably would be better demolished in any case.]]>
		</description>
	</item>
	<item>
		<title>heritage statement?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9221</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9221</guid>
		<pubDate>Tue, 19 Jun 2012 08:26:31 +0100</pubDate>
		<author>EmmaG</author>
		<description>
			<![CDATA[Has anyone had to complete a 'heritage statement' for a solar panel planning application? I would really like to see a completed one if anyone would be happy to share? Thanks]]>
		</description>
	</item>
	<item>
		<title>Good news for offshore wind.</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9209</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9209</guid>
		<pubDate>Fri, 15 Jun 2012 09:27:36 +0100</pubDate>
		<author>Joiner</author>
		<description>
			<![CDATA[And at last a hint of joined-up thinking and pooling of brains...<br /><br />http://uk.news.yahoo.com/uk-see-cheaper-offshore-wind-2020-reports-103654499--sector.html]]>
		</description>
	</item>
	<item>
		<title>FiT Provider</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9070</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9070</guid>
		<pubDate>Mon, 14 May 2012 09:56:36 +0100</pubDate>
		<author>jms452</author>
		<description>
			<![CDATA[We are hopefully having PV installed this week and I have spent the weekend reading through my current electricity supplierâ€™s Fit info.<br /><br />I was annoyed to see that if I want to change electricity supplier in future I also need to transfer my FiT provider to the new company.<br /><br />http://www.npower.com/idc/groups/wcms_content/@wcms/@resi/documents/digitalassets/fit_information_booklet.pdf (p4).<br /><br />I will probably find that they arenâ€™t the best deal when our already low usage drops and I would like to avoid reams of paperwork every time I want to change electricity company.<br /><br />I donâ€™t really fancy transferring to utilities warehouse for a strings attached short term sweetener.<br /><br />I have spoken to good energy who I saw mentioned positively on other forums and they seemed helpful and donâ€™t restrict me from changing electricity supplier but admitted it could take 9 weeks for me to get the cash after submitting meter reading! Is this normal?<br /><br />Any recommendations (you can whisper if you feel more comfortable).<br /><br />Thanks<br /><br />John]]>
		</description>
	</item>
	<item>
		<title>Solar pv, EPC and July</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9174</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9174</guid>
		<pubDate>Thu, 07 Jun 2012 11:18:01 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[Do you know if I can go ahead and get it installed before the July deadline and still qualify for the 21p payment even if I have to get the EPC up to spec afterwards?]]>
		</description>
	</item>
	<item>
		<title>6 months on, anyone heard anything more?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9176</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9176</guid>
		<pubDate>Thu, 07 Jun 2012 14:03:16 +0100</pubDate>
		<author>Joiner</author>
		<description>
			<![CDATA[http://new.wales.gov.uk/newsroom/environmentandcountryside/2012/120123sbed/?lang=en]]>
		</description>
	</item>
	<item>
		<title>Eoltec 6kw in now MCS approved, but....</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7560</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7560</guid>
		<pubDate>Mon, 04 Jul 2011 12:23:35 +0100</pubDate>
		<author>pauler</author>
		<description>
			<![CDATA[Will it live up to it's previous claims of 22,00 kwhs @ 5.75m/s as seen here - (http://news.bbc.co.uk/1/hi/sci/tech/8139373.stm ) figures which are backed/endorsed and promoted on their own website, by Eoltec themselves...and some installers.<br /><br />Or will the MCS figures show a completely different story....:wink:]]>
		</description>
	</item>
	<item>
		<title>Keep those PV arrays clean or this will happen!!</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8491</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8491</guid>
		<pubDate>Thu, 26 Jan 2012 16:48:11 +0000</pubDate>
		<author>Triassic</author>
		<description>
			<![CDATA[Thought some of you would be intrested in what happens when you put PV arrays on Mars - They get dusty and you can't go and clean them.<br /><br />http://roadtoendeavour.files.wordpress.com/2012/01/polar_project_array.jpg<br /><br />and if you want to learn more<br /><br />http://roadtoendeavour.wordpress.com/2012/01/24/different-views/]]>
		</description>
	</item>
	<item>
		<title>Our rivers and power generation</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7926</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7926</guid>
		<pubDate>Tue, 11 Oct 2011 16:47:45 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[I recently discovered that a private mill owner on one of our major rivers has bitten the bullet and installed a small hydoo plant<br /><br />the cost was about 600k, <br /><br />Archimedes screw turbine - grid linked  --  had to get an abstraction licence even though there was an an existing working mill there and no water gets abstracted.<br /><br />Pays for itself in 9 years!!!<br /><br />Then profit all the way into the future<br /><br />Why are these things more prevalent????  Especially if they generate that much electricity and are so hugely economic?]]>
		</description>
	</item>
	<item>
		<title>hydro</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9098</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9098</guid>
		<pubDate>Sun, 20 May 2012 16:46:38 +0100</pubDate>
		<author>ianandbecca</author>
		<description>
			<![CDATA[Freeflow installed a weir,and penstock, 2 years ago, but never got round to installing the turbine, so I got a local company to build me a small pelton turbine, which they promised would generate 1-2kw. After a few months and trying everything they could, it still only produced 300w, so they took it back and gave me a full refund.<br /><br /> I am left with the penstock, running past my house, with no turbine at the bottom, what a waste.<br /> <br /> Is there anyone out there that would be interested in supplying a turbine<br /><br /> I have 12m head, 180mm penstock running 130m to turbine house, with a few bends. It is capable of supplying 40l/sec, when the burn is at average flow.The company that built my last one measured the pressure at the bottom of the pipe, it was 1 bar. They thought a small crossflow was what I needed.]]>
		</description>
	</item>
	<item>
		<title>BS 5918 Solar heating systems for domestic hot water</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9084</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9084</guid>
		<pubDate>Thu, 17 May 2012 13:33:49 +0100</pubDate>
		<author>davidfreeborough</author>
		<description>
			<![CDATA[The British Standards Institute has published a draft standard for domestic solar hot water systems. It appears to assume a pressurised system with heat exchanger inside a domestic hot water tank &amp; to exclude all other approaches. This is a strange approach given the immaturity of the market in the UK &amp; the benefits of alternative approaches. For example, it would seem to exclude drainback systems where a thermal store also acts as the drainback reservoir. <br /><br />Hopefully this draft standard will encourage some informed debate &amp; be re-written in a way that encourages innovation in both component &amp; system design. If it goes ahead unchallenged, it will probably have a negative effect on the development of efficient, low cost, integrated systems for new build or retrofit.<br /><br />If you have any views then you might like to comment on the current draft: <br /><br />http://drafts.bsigroup.com/<br /><br />Search for BS5918 &amp; you should find &quot;Draft BS 5918 Solar heating systems for domestic hot water â€“ Code of practice&quot;.<br /><br />You need to register to leave comments, but registration is free &amp; quick. <br /><br />David]]>
		</description>
	</item>
	<item>
		<title>Filsolar - Solar Thermal</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8352</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8352</guid>
		<pubDate>Tue, 03 Jan 2012 14:25:45 +0000</pubDate>
		<author>mzthomps</author>
		<description>
			<![CDATA[I've got two filsolar thermal flat plat style panels approx 2.1msq each fitted in 2005.  During the recent install of some solar pv panels on the same roof, the solar installer noticed that both the panels had split .<br /><br />Luckily I have a letter from the solar installer which referred to a 10 year warranty on those panels, which they are following up on with Filsolar (albeit Filsolar rather slow to respond).<br /><br />Apparently this is common.  Anyone else had problems with Filsolar kit or flat panels?<br /><br />Thanks,<br /><br />Mark]]>
		</description>
	</item>
	<item>
		<title>C&amp;F Customers' Group</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9082</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9082</guid>
		<pubDate>Wed, 16 May 2012 22:28:08 +0100</pubDate>
		<author>alexsmb</author>
		<description>
			<![CDATA[I have started up a dedicated group for C&amp;F customers.  Have a look at http://groupspaces.com/CFCustomers<br /><br />We have started putting up monthly turbine production stats too.  Look at the tab at the top right.<br /><br />The more people that join the more useful the information in the statistics, and the forum, will be.]]>
		</description>
	</item>
	<item>
		<title>4.00kWp pv system price</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9050</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9050</guid>
		<pubDate>Tue, 08 May 2012 18:46:03 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[What is the going rate for 4.o kWp solar pv system now?]]>
		</description>
	</item>
	<item>
		<title>Down only escalators</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9049</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9049</guid>
		<pubDate>Tue, 08 May 2012 15:21:29 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[Had an interesting discussion with a bemused top manager of a transportation provider about escalators on 24/7<br /><br />After I wrote to T5 about this they now mostly only run escalators on demand<br /><br />But for up escalators all the work of lifting people is at an energy cost, if there were down escalators (not the case in question) almost all the energy could be reclaimed.<br /><br />But if there were more down escalators than up ones then energy could be generated free of charge form the general public :swingin:]]>
		</description>
	</item>
	<item>
		<title>C &amp; F Orkney Meeting</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9020</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9020</guid>
		<pubDate>Thu, 03 May 2012 16:02:19 +0100</pubDate>
		<author>gavstamp</author>
		<description>
			<![CDATA[Can anyone tell me more about the meeting regarding C &amp; F turbines in Orkney. A previous thread mentioned that C &amp; F had told their reseller not to go. What was the purpose of the meeting and why didn't C &amp; F want a presence there?]]>
		</description>
	</item>
	<item>
		<title>Water turbine</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9016</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9016</guid>
		<pubDate>Wed, 02 May 2012 23:04:24 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[The river level and flow on the river near me has greatly increased but the turbine is producing less power!<br /><br />The top level has risen by 600mm but the lower level by 1.6m meaning that the head is one meter less!<br /><br />:sad:]]>
		</description>
	</item>
	<item>
		<title>Preventing grid supply in a FITs situation</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8769</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8769</guid>
		<pubDate>Fri, 09 Mar 2012 18:55:55 +0000</pubDate>
		<author>GBP-Keith</author>
		<description>
			<![CDATA[Hi. Does anyone know of any way of preventing grid power coming back along the line and feeding loads in a PV grid connect situation? <br /><br />I have been thinking of some sort of blocking diode but I'm betting it won't be that simple.<br /><br />I want to run a few small resistive loads during sunshine periods on simple timers but I don't want the grid to feed them if the sun goes behind a cloud.<br /><br />I also don't know how the grid connected inverters would cope - I am assuming any blocking diode would prevent them seeing the grid and they would go off <br /><br />Clearly an unusual ask but I need to look for a solution.<br /><br />Any and all suggestions gladly accepted.<br /><br />Thanks, Keith]]>
		</description>
	</item>
	<item>
		<title>PV grid voltage fault</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8262</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8262</guid>
		<pubDate>Sun, 11 Dec 2011 11:29:04 +0000</pubDate>
		<author>mzthomps</author>
		<description>
			<![CDATA[I have been observing a problem with a recent solar pv installation which is preventing it from generating properly:<br />The inverter is regularly reporting a grid fault and cutting out for 600 secs resulting in very little overall generation.  This appears to be more prevalent when it is generating above 1kw. I have noticed that it always seams to be operating at an AC of 251 to 253V - to the top end of the DNO tolerance of 253V.<br />After a forced reboot (I turned off the AC, DC and then switched back on), it restarts OK for a while, but I have managed to capture it operating at 255V - which is I guess the reason why it is cutting out?<br /><br />Others in the area with solar pv don't have a problem (or maybe they don't understand what they are looking at to know?)  I don't have sufficient kit to carryout any analysis on the true grid voltage.<br /><br />Inverter is a Schuco SB2500HF-30.  System is 2.5kwp.  Fitted by SolarTech.<br /><br />Haven't been able to have a sensible conversation with installer yet.  I guess they are maxed out the FIT deadline.  I'm loath to raise it with the DNO until SolarTech have discounted a problem with the inverter.<br /><br />Any ideas what could be causing the problem?  Thanks.]]>
		</description>
	</item>
	<item>
		<title>Biophotovoltaic Moss</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9000</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=9000</guid>
		<pubDate>Fri, 27 Apr 2012 19:59:16 +0100</pubDate>
		<author>RobinB</author>
		<description>
			<![CDATA[OK it's not actually very useful and I prefer Japanese moss gardens but I kind of like the moss table...<br /><br />http://inhabitat.com/moss-table-by-biophotovoltaics-generates-electricity-through-photosynthesis/]]>
		</description>
	</item>
	<item>
		<title>Pyrolysis of waste rather than incineration</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7974</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=7974</guid>
		<pubDate>Wed, 19 Oct 2011 12:21:12 +0100</pubDate>
		<author>SteveZ</author>
		<description>
			<![CDATA[Recently the incinerator proposed for Cornwall has had its planning permission revoked, so we can look forward to another round of legal battles and more wasted money, wasted unless you are in the legal profession of course!<br /><br />Does anyone have in-depth knowledge of the process of slow and/or fast pyrolysis? It seems to be a good technique of dealing with most of the organic rubbish which finds its way into landfill or the incinerator.<br /><br />Before the flood of comments about reduce, reuse and recycle come in, I would like to say that I agree that is the best way but, in the real world, we need a better way to dispose of the rubbish in the near future.<br /><br />In pyrolysis, the organic rubbish is ground small and dried to remove most of the water content, then is heated in an oxygen deprived atmosphere. This produces gas, oil and a solid char. The proportion of each can be adjusted by changing the conditions and is also dependent on the raw material. The gas produced can be used to heat the process plant in a closed loop and any excess modified separately into liquid fuel. The oil can be used as is or refined into diesel fuel. As the exhaust gases are recirculated into the plant there are no or very few emissions from the plant. The char is, according to the trial results, a very effective slow release fertiliser and soil improver.<br /><br />I don't think pyrolysis plants are available off the shelf yet and the technique is not fully sorted, but it seems to offer such possibilities that I am surprised (or suspicious) that there is not more publicity about it.<br /><br />if it all sounds too good to be true, then maybe we could dig a little deeper and see if this is one which is actually as good as it sounds]]>
		</description>
	</item>
	<item>
		<title>Mounting PV panels</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=6877</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=6877</guid>
		<pubDate>Wed, 26 Jan 2011 21:14:37 +0000</pubDate>
		<author>david</author>
		<description>
			<![CDATA[I had two MCS accredited installers to survey and quote for mounting PV panels on a slated roof.<br /><br />The first would drill holes through the slates, fix brackets to the rafters and fit rails to the brackets. The holes in the slates would be covered with a small piece of lead.  The fixings would leak, the slates would be cracked or broken, it would be impossible to fix the brackets securely without breaking slates and the array would rattle in a wind. The second is more conscious of the fact that a roof is designed to keep water out but both had no method to use to decide how many fixings were necessary.  The site is very exposed.<br />When the panels are fittted the fixings are invisible and difficult to repair.<br /><br />I searched the net for an approved system for use on slate roofs but found none.<br />I spoke to Building Control, pointing out that PV panels could blow off and be very dangerous, that the integrity of slate roofs was damaged by drilling holes in slates.  I asked if there was a BBA accredited system.  While they understood the problem they could not advise me.<br /><br />Fitting PV panels to a slated roof could be a disaster,  the roof could be ruined, the panels could come off and injure someone.  It could cost more than the system was worth to repair the roof.<br />Is there a BBA accredited system for mounting to slates?  <br /><br />I have designed a bracket and flashings which will not leak but how many fixings per area of panel are required and how strong do they have to be?  Could I use my brackets without BBA?  Who knows?]]>
		</description>
	</item>
	<item>
		<title>which windturbine?</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8657</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8657</guid>
		<pubDate>Sun, 19 Feb 2012 11:05:05 +0000</pubDate>
		<author>katys</author>
		<description>
			<![CDATA[We're coming to the end of our house rebuild and may have some money available for a wind turbine (insulation, draft proofing etc already done). We have planning permission for a Proven 6kW on a 15m mast, which seem to have been replaced by the Kingspan KW6 following the takeover from what I can find via Google. Presumably I'd need to vary the planning permission for this or another turbine make, is this right <br /><br />The windspeed is 5.6m/s at 10m for our grid ref, although may be higher as we're positioned towards the top of the hill, close to a small commercial windfarm (possibly soon to be a huge one if they get planning permission).<br /><br />I'd be grateful for any thoughts/experience on whether the KW6 is any good (looks very similar to the previous Proven one) or alternative recommendations, ideally MCS approved. Given the proposed cut in FITs I guess we need to make a decision quickly.]]>
		</description>
	</item>
	<item>
		<title>DIY Solar project connection help</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8928</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8928</guid>
		<pubDate>Thu, 12 Apr 2012 22:20:14 +0100</pubDate>
		<author>budbecks</author>
		<description>
			<![CDATA[Hi all,<br /><br />Ok i have a old rad and can make a box similar to the one described here<br /><br />http://www.diydata.com/projects/solarpanel/solar_collector.php<br /><br />All i want to be able to do is heat 1 rad from the &quot;solar collector&quot;. Both rads are about the same size, if anything the rad indoors is slightly larger.<br /><br />The &quot;solar collector&quot; is outside about 7 meters away from the internal rad. All the pipes will be super insulated using 32mm wall 15mm armaflex. It can be pumped using a heat stat and pump or failing that just gravity.<br /><br />Could anybody show me the simplist way to plumb this in ?<br /><br />Could i literally connect each rad up, the solar being lower to allow to rise ? possibly adding a vent to the rad ?<br /><br />Any help would be great]]>
		</description>
	</item>
	<item>
		<title>Will the green deal save homeowners money</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8934</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8934</guid>
		<pubDate>Fri, 13 Apr 2012 17:52:38 +0100</pubDate>
		<author>Brianwilson</author>
		<description>
			<![CDATA[Thought this may be of interest<br />http://www.guardian.co.uk/environment/blog/2012/apr/13/green-deal-save-homeowners-money]]>
		</description>
	</item>
	<item>
		<title>Using Iceland's green energy</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8939</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8939</guid>
		<pubDate>Sat, 14 Apr 2012 12:38:41 +0100</pubDate>
		<author>tony</author>
		<description>
			<![CDATA[There is a proposal to link us up to Iceland via a high voltage DC cable<br /><br />I like it, we would then have access to cheap green volcanic electricity.]]>
		</description>
	</item>
	<item>
		<title>Heat Pump Dissertation Questionnaire</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8885</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8885</guid>
		<pubDate>Tue, 03 Apr 2012 09:00:05 +0100</pubDate>
		<author>ro83llis</author>
		<description>
			<![CDATA[Hi all,<br /><br />I'm currently writing a dissertation on Heat Pumps in the UK and would greatly appreciate it if you could help me out by filling out my questionnaire and providing feedback.<br /><br />If anybody would be happy to also discuss their experiences with Heat Pumps please let me know.<br /><br />Here is the link to the survey:<br />https://www.surveymonkey.com/s/heatpumpquestionnaire<br /><br /><br />Please note this is for my dissertation and not for general release and not for any commercial interests.<br />All responses are anonymous.<br /><br />Your participation is greatly appreciated! If you have any further comments please leave them here.<br /><br /><br />Many Thanks<br />Rob]]>
		</description>
	</item>
	<item>
		<title>Using solar panels with megaflow ( pressurised cylinder)</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=5287</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=5287</guid>
		<pubDate>Tue, 02 Feb 2010 20:46:26 +0000</pubDate>
		<author>wertert</author>
		<description>
			<![CDATA[Hi All<br />Really been round the houses during the last few weeks, thinking about using some green technology in our new house.  We are part way through a refurb and my fafing about is now starting to delay the project !<br /><br />We've binned the woodburner-connected-to-the-cylinder idea because it was relatively complex and, if iâ€™m honest, we probably will only light it at the weekends etc.  Overall I donâ€™t think it will really make that much difference to our heating costs / carbon footprint.<br /><br />So Iâ€™ve been considering  Solar panels.  Weâ€™re using a dual coil cylinder like this<br /><br />http://www.santon.co.uk/292.htm<br /><br />plan is for a 300L tank.<br /><br />We would use the second coil for the connection to the solar panels on the roof.  These are the things that I am currenty worrying about.<br /><br />1)	My experience of megaflows is once you draw off, for example, a bath full of hot water cold water rushes in and cools the remaining  hot water down.  You try and top up the bath after 10 mins and you just get luke warm.  So if Iâ€™ve got a lovely tank of hot water heated via my solar panels during the day  and someone has a shower at 5pm we will will probably end up with a tank full of water too cool to use for anything else without firing up the boiler.<br /><br />2)	300L is too large and to heat this with solar panels I will need to buy panels I donâ€™t really need.  Tank supports the following ( 2 adults + 4 children ).  <br /><br />En suite bathroom (2 x baths a day) + 2 sinks<br />Another Bathroom ( 1 x bath a day ) + 1 sinks<br />Kitchen sink<br />Utility room sink<br />WC sink.<br /><br />This is only half the house BTW.<br /><br />So iâ€™m thinking 300L is overkill.   Maybe 200L/250L would be a better fit ?  I normally think bigger is better but<br />If 1) is true then it is doubley daft to heat 300L before cooling it down after using just 60L on a bath.<br />Any advice would be excellent as Iâ€™ve really got to move forward and Iâ€™m meeting the plumber on Thursday.  He already  thinks  iâ€™m insane...which is partially right actually.<br /><br />Thanks<br /><br />Jeff]]>
		</description>
	</item>
	<item>
		<title>LENR produces 100's of kW</title>
		<link>https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8030</link>
		<guid isPermaLink="false">https://www.greenbuildingforum.co.uk/newforum/comments.php?DiscussionID=8030</guid>
		<pubDate>Sat, 29 Oct 2011 09:55:12 +0100</pubDate>
		<author>CWatters</author>
		<description>
			<![CDATA[I hesitate to post this as it could all turn out to be a scam and the web site isn't exactly known for good science but the story continues to run.  <br /><br />Yesterday an Italian, a  Mr Rossi, claimed to demo a LENR (aka cold fusion) reactor producing several hundred kW for many hours. The demo wasn't intended to prove anything to the world at large but was intended to convince a &quot;secret&quot; paying customer.<br /><br />http://pesn.com/2011/10/28/9501940_1_MW_E-Cat_Test_Successful/<br /><br />Quotes:<br /><br />&quot;It ran for 5.5 hours producing 470 kW&quot;<br /><br />&quot;That's half the rated capacity, but it is still a major accomplishment.. &quot;<br /><br />&quot;Radiation measurements were taken by Dr. Bianchini David, from the University of Bologna. He said no extraneous radiation was detected at any time emanating from the reaction chambers,..&quot;<br /><br />&quot;Rossi has been very picky about who he lets in; Enrico Billi, a nuclear physicist and friend of Rossi's, who is presently living in China and helping to open doors there for this technology; Professor Christos Stremmenos, from the University of Bologna, who told me all about his theory of how the technology works; Pierre Clauzon, nuclear engineering professor from France, who told me about several theoretical physicists trying to understand cold fusion in general and the E-Cat in particular; Uzikova Irina, a nuclear plant designer from Russia; Stefan Heglesson, representing a Swedish interest in the technology; Loris Ferrari, Associate Professor of Condensed Matter Physics from the University of Bologna..&quot;<br /><br />&quot;Probably the biggest opening for skeptics will be the continually running genset that is probably rated for 500 kW&quot;<br /><br />My comments:<br /><br />Still can't decide if this is a scam or not. It's certainly not been proved beyond reasonable doubt but some very credible people have seen this and other demonstrations and they appear convinced. Time will tell.]]>
		</description>
	</item>
	
		</channel>
	</rss>