Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.

The AECB accepts no responsibility or liability for any errors or omissions in the content of this site. Views given in posts are not necessarily the views of the AECB.



  1.  
    Hi Nick, I just calculeted a u-value base on the k-value of strawboard [0.1W/mk] I got the figure from a Strawboard manufacturer and assumed [wrongly]that it would be the same for all straw. Thinking about it, straw would be better as it has no facing materials. If anyone knows the k-value of a straw bale I can re-calculate though I guess you must be right.
  2.  
    Katy (sorry, called you Katie before). You asked "Won't the straw bales shade the windows?". Not if you mount them in the bales, with a min 100 - 150mm reveal. Any internal splay you wished for could be cut into the concrete blocks with an angle grinder. If you are not sure about U values, for a very basic explanation, have a look at our site: www.syec.co.uk/factsheets. I wonder if your build could be the site for the first Green Building Forum 'get-together' (allowing us to meet the real people), with a side benefit of, say, a day's labour per attender??? Got camping? Just a thought....Nick
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 4th 2007
     
    Yep - loads of field
    Loads of food (I cook professionally)

    Lots of party.....maybe a scrap of work??

    & if anyone need to bring family - I can look after them!!
    •  
      CommentAuthorKieran
    • CommentTimeFeb 5th 2007
     
    Hi Katymac

    I am very nervous for you. I am an architect and think the spons book will do you no good whatsoever. The books are about 700 pages thick, weigh in at about 6kg and, even if you can lift it, getting it to work for you as skywalker describes is next to impossible. Spons is aimed at Quantity Surveyors doing medium to large scale projects with medium to large contractors whose prices are predicatble within limits (usualy 25% added on at the end). Small scale projects or anything quirky (green) won't be covered. For most contributors to this forum (from what I've read) I doubt spons would be of any use (although I would love to hear of anyone actually using it).

    But I whole heartedly agree with this part of Skywalkers advice:

    "If I were in your position I would take a really deep breath and consider getting the building up and running in the simplest and cheapest fashion that will comply with the regulations and look at retrofitting all the green stuff later. The only element I would retain is the (super) insulation where it will be hard to retrofit but only if you can afford it and still complete."

    You should be able to find an architect who can work to this brief. (You might also consider a good building surveyor).Check the RIBA and RICS websites. Get a list of 3-5 architects (or surveyors) that you can go and interview / discuss the project with. That will tell you very quickly who can help. Perhaps the carrot for them is the chance of future work doing the retrofitting?
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 5th 2007
     
    Gentlemen - I now have a way of showing you my latest floorplan for the nursery

    http://www.mumsnet.com/member/MemberPage?o=1170704297395&call=ImageGallery but I can't make it a link - this is my other site btw (some of you have been very critical of it....but us girls like it)
    •  
      CommentAuthornigel
    • CommentTimeFeb 5th 2007
     
    Sorry but I cant log in and I am not a mum.http://www.greenbuildingforum.co.uk/newforum/extensions/Vanillacons/smilies/standard/bigsmile.gif
    •  
      CommentAuthornigel
    • CommentTimeFeb 5th 2007
     
    what happened to my smilie:bigsmile:
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 5th 2007
     
    http://www.mumsnet.com/member/MemberPage?call=PublicPage

    Is that better (haven't worked out links yet sorry:cry:
    •  
      CommentAuthornigel
    • CommentTimeFeb 5th 2007
     
    Still wants mumsie to log in:bigsmile:
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 5th 2007 edited
     
    Well you will have to arrange to have pictures to appear here then
    • CommentAuthorskywalker
    • CommentTimeFeb 6th 2007
     
    Hello Katy/Keiran/all

    Keiran:-

    Point taken on Spons - I was just trying to help Katy get nearer to realistic prices. I have used Spons extensively for small and medium projects at the estimation stage (I am an ecologist) and found it handy in terms of getting close to what stuff might cost. In particular, using this method, has been usefull when understanding the neccessary add ons for wierd and unusual jobs which contractors/in house construction staff have then come up with (also for when I'm being sold a line!). Admittedly I have used it a lot and been supported by Landscape/building architects form time to time and, I confess, I have never used it for 'green' building per-se. The guides are 'technical' (in the sense that you have to get the hang of the technique) to use and this can lead to problems. Apologies Katy - Spons may not be the best route for you

    Regards.

    S.
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 6th 2007
     
    S'ok Skywalker - I never do anything that someone has used "technical" when discussing it:bigsmile:
    • CommentAuthorskywalker
    • CommentTimeFeb 6th 2007
     
    Hello Katy

    I did not intend, either by statement or ommision, to imply that you would not be able to understand technical stuff.

    Apologies for any offence/slight you may have percived.

    S.:shamed:
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 6th 2007
     
    Hang on I was agreeing with you.....(at least I think I was)

    I'm not technical - not at all

    I'm also not offended by the suggestion that I'm not technical
    • CommentAuthorskywalker
    • CommentTimeFeb 7th 2007
     
    That's all right then!

    S.
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 7th 2007
     
    :tongue::wink:
    • CommentAuthorGuest
    • CommentTimeFeb 12th 2007
     
    Katy, I can't comment on most of your problems but I'm inclined to agree with Skywalker's advice. However, it might interest you to know that we put in our own new septic tank in 2002: it took us about three days and cost us £1,700, including all kit, aggregates, and the hire of a digger and driver for those three days. The only labour we had was my husband and me (he's very useful and digs a lot, I make sausage sandwiches and take photos). This was after we got quotes in which ranged from £10,000 to £15,000. Then last year we put in a rainwater harvesting system: again, cost about £1,500, took us three days or so. As we've renovated our house we've made sure that the toilets all flushed from tanks up in the attic, rather than direct from the "mains" (our well), so there was no special internal plumbing alterations to make.

    Things like this depend on how much time and skill you have. But those two projects were very simple, and just needed muscle. And lots of sausage sandwiches.

    Jane
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 12th 2007
     
    I can do sausage sandwiches (pizza too) so we might get there

    I also know a man with a digger:wink:which could save a bit iyswim
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 12th 2007
     
    Quite despondant atm - None of the architects I have approached are interested. |Neither the cabin people nor the Amazon Nails people haven't got beack to me

    Not quite sure yet what to do with £55K cash plus £75K potential lending if I don't open the nursery.

    I'm feeling very down - I have been planning this for ages

    Apparently it would work - if I had mopre money but even if the bank were to lend me any more - I'm not sure I can afford to borrow it (iyswim)
    • CommentAuthorGuest
    • CommentTimeFeb 12th 2007
     
    Katy. Sorry you're feeling low. Have a sit down, a cup of tea (or stronger), a bit of a wail: get over it, and tomorrow, or the next day, but not much later, work out exactly what you can and can't do. Don't feel despondent over what you can't achieve: just consider what you can do now, and what you can plan to do later. If you spend too long worrying then you'll endanger the whole project, which would be terrible.

    You could perhaps visit a bank and ask if they give out business start-up packs. Most do, and they often come with software which will allow you to produce a spreadsheet that will help you make a realistic, achievable plan. And be pessimistic when you do that, so that you build in a contingency-plan. Who knows: you might get a nice surprise after six months of trading, which is better than a nasty surprise. There's no point borrowing money if it'll bankrupt you.

    We can't do everything we want to do right now. We've been in our house ten years so far, and it's nowhere near finished. We've had to compromise along the way but we hope we've not done anything that has spoiled anything, or that has to be undone to get it right later. And now, ten years later, things are fine. Unfinished, but fine, and we're still here. And able to pay our mortgage, and complete a couple of projects each year. I hope you manage to do the same, or better, than us. Best of luck with it.

    Jane
    PS--Where are you, in the country? Just wondered.
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 12th 2007
     
    Thanks Jane

    I have a business plan & it seems achievable (well the bank likes it enough to lend me money unsecured)
    The problem isn't running the business - it's getting the building ready

    I can't afford to borrow more - I can't work out a way to renovate for less
    I need to do something as I can't let the money I have just sit there

    btw I'm in (very) rural Norfolk
    • CommentAuthorGuest
    • CommentTimeFeb 12th 2007
     
    I meant that as part of the building plan you put in what you can afford now, in the way of renovations, and then factor in when you can afford more. So that you know you're working towards getting what you want. If the bank likes you enough to lend you money then you must be doing something right.

    What are your priorities here? To get the nursery up and running, as I see it. And in as environmentally-friendly a way as possible. For example, perhaps you can't afford the rainwater thing now: just make sure things are done so that when you can afford it, it's easy to retrofit, rahter than you having to have things ripped out to fit it in.

    I hope things work out for you, really. And that it all seems brighter in a few days.

    J
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 12th 2007
     
    The harvesting & solar panels are now long gone

    I am struggling to get anarchitect to consider my prices for jobs ect - even if I have a quote from a builder
    • CommentAuthorGuest
    • CommentTimeFeb 12th 2007
     
    Hi Katy
    I'm sure you can do this! I've followed your posts for a while. I find looking after my own children very demanding - much more so than anything a construction project can throw at you. If you can look after a whole lot of someone else's children (albeit with help...) you can definitely do this thing! You just need to make a bit of progress. I am working on an extension to our house. I gave up my job to do it myself because no local builders would look at the job for a price that we could pay - "too complicated" one said. Over the last few months I've been working on the building right through that worst winter weather. I've had the some of the lowest feelings sometimes about the job, working alone in the cold, wet and frequently in the dark while my three year old son is with a (brilliant) childminder. But you just have to keep going and you'll get there - really I think that you will.

    I think the general point that's being made is to get some good advice. That's something I would agree with but I have to differ slightly from some of the other posts. I don't think than an Architect is always the default option. Once an Architect had drawn up our extension we got an "architectural consultant" to do the building regulations. He was perfectly capable and cheaper than the Architect. Kieran sounds very helpful but my experience of Architects was largely disappointing. Most didn't want to bother with a small job like ours and if they did it was only on condition that they would project manage it. So you might look at someone slightly less accomplished than an Architect and you may save a little money there. The Architect who did our design had a secret loathing of solar panels (which he never told us about) so he was strangely reticent about our request to factor in solar thermal. As an "alternative" he (really truly) suggested wrapping 15mm plastic pipe around the rafters! Architects, like every other trade and profession, can be good or poor. As a consequence of this weird hidden agenda we decided to get some better advice and found an extremely helpful sustainability expert from the Green Building Bible. He was able to do a sustainability audit fairly inexpensively. I think someone that you can work with (and not someone who feels they're doing you a favour by taking your hard borrowed mortgage money) would be helpful for you.
    (cont..
    • CommentAuthorGuest
    • CommentTimeFeb 12th 2007
     
    As a self builder I am "clearly a novice" as someone put it elsewhere in this forum and so I have only my own experience to talk about. But if you can find a way to use straw bales you could stack and fix them yourself. Book yourself on a straw bale building course even a one day course. if there's not one locally I will find one for you down here in Dorset and find you somewhere to stay. In the meantime get a copy of the 'Grand Designs' programme that featured the cruck frame straw bale house http://www.channel4.com/4homes/ontv/grand-designs/houses/S/sussex_woodman.html . Inspirational. As a complete novice it is fantastic to be able to come to the forum and get the benifit of the expertise, skills and knowledge from construction industry professionals and others. But reading through this last thread of your I can see why you're feeling low. I think what Skywalker suggests is helpful - get the building going and then add more sustainable options. But, and speaking as a novice, I am not conviced that Biomass is such a non starter. It may not be appropriate but my biomass boiler will cost about £3,000 with the accumulator about £2,000 to be installed by local heating engineer. So it is getting more affordable. I would think very hard about opting for oil and then going over to biomass later. It's not very sustainable to put in a storage tank and boiler and then make them redundant just to burn biomass in a brand new boiler a few years down the line. If you can find any way of not putting in PVCu windows that would be a major achievement. Apart from it's low cost this material is very very low down the list of sustainable building materials! French joinery is of a very high standard but is less expensive that some of the UK joinery manufacturers. You could Google Bieber windows. As somone else said some of the costs look about right while others look high. As I have even less experience of public buildings than dwellings I should really keep my novice mouth shut but I think you can get some things done for a little less. Of course you should have a chainsaw ticket if you're using a chainsaw just as you should have a digger ticket. I found a young lad though the job centre who had driven diggers since he was a child. He was extremely efficient although he had no ticket. We hired a digger and did all the groundworks ourselves for far less than the quotes we had. There wasn't any way we could have afforded it otherwise. We did it properly, we didn't cut corners on building regs. or safety and it has all been passed by Building Control. If you're prepared to tackle some of the management yourselves you'll be able to make some small savings.

    So you've got to do keep going and not get too down about the whole thing. As someone suggested phase the approach or if you can't do that try dealing with one thing at a time. If you try and solve all those complex problems all at once you'll get a real headache - I tried it and had one for months. Now I try to tackle one thing at a time and once that's going ok start thinking about the next phase. But I am quite sure you can do it.

    This is probably not very helpful but i just wanted to let you know that there are many of us out there, struggling on, getting it done so don't feel you're on your own. Finally I should add that as a complete novice none of the information I have given can be relied upon and should be treated as anecdotal and unproven!
    I'll follow your next step with interest....
    Julian
    •  
      CommentAuthornigel
    • CommentTimeFeb 13th 2007
     
    Sadly you are not going to get this project going without an architect, architectural technicians are more experienced at residential work.

    You are building a commecial premises and will need to satisfy some fairly onerous bureaucratic nonsense namely:
    SBEM calculations - the commercial equivalent of SAP 2005.
    Construction Design and Management - Health and safety regulations.
    Legionella Control - Satisfying the ACOP.
    Fire Regulations and risk assessment.

    I am not trying to put you off and with determination you are going to be able to do it. But you really need to find a professional that wants to do your project and is perhaps used to working with green minded individuals on a restricted budget.

    Have you checked out the aecb member list?
    • CommentAuthorskywalker
    • CommentTimeFeb 13th 2007
     
    Hello Katy

    Hope you are OK.

    Most projects have their low points, many have more lows than highs, some of the 'worst' projects I have been involved with have still had great outcomes even if the final output bore little resemblance to the original vision. The key is ensuring that you are able to carry out what you originally wanted to successfully (in your case without too many 'green' thingies but a functioning nursery: on one spectacular case for me without a 'feature' stainless steel tree top path/cycle/wheelchair route all cantilevered off one post! but a very nice a well used new local park).

    Local to me there is a nursery/after school club working out of porta cabins. They have plans to rent/aquire new premises in the future but the main point is they are able to work with these structures.

    So the question is is there another way you can get your nursery running (either on this site or elswhere), get an income stream & thus improve your ability to repay a larger loan, then go for developing the site. Alternatively do you need the whole area of car park, play, access works externally and the whole of the internal space to be operational from day one (many inner city nurseries have no outside play area); in other words can you phase the development. The latter will depend on how many children you are certan to get to start off with. I do not know how you project nursery places ( I guess checking the local governement/office of national stats will help = number of children of nursery age when you plan to open vs number of housholds with children of nursery age with working parents - number of existing places or something like that) but you will inevitably start off with small numbers and build up or only be able to cater for small numbers. If, in time, you have a waiting list and can demonstrate robust finances you may even be able to get a better load deal.

    Nigel is right. Whilst you will be able to DIY some elements of the build you need to be absolutely certain you will comply with all the regs or the project will fail; for this you need proffessionals.

    S.
    • CommentAuthormark
    • CommentTimeFeb 13th 2007
     
    i guess you hate oil boilers because of the fossil fuel element!
    another option is to get an oil boiler running on biodiesel (from recycled oil) or veg oil
    • CommentAuthorGuest
    • CommentTimeFeb 17th 2007
     
    Why not try posting a plea for help on the public forum at www.aees.co.uk? This is seen by students on the CAT Architecture course, some of whom might help out for the experience... if you can get a design, I'll do the SBEM calcs for you.
    bob.irving@zen.co.uk
    •  
      CommentAuthorKatymac
    • CommentTimeFeb 17th 2007
     
    Wow Bob (or guest:wink:) That's a really kind offer (probably kinder than I imagine as I don't know what a SBEM calculation is)

    I'll have a look at that site - Thank you
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press