Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.

The AECB accepts no responsibility or liability for any errors or omissions in the content of this site. Views given in posts are not necessarily the views of the AECB.



  1.  
    Any preference even looking at 3G Alu-Clad?
    •  
      CommentAuthordjh
    • CommentTimeJul 3rd 2026
     
  2.  
    I was introduced to AB's products by a client who used the timber 2G products and was delighted with the cost/quality balance.

    Just be sure when talking to AB that you are discussing lead times for the alu clad windows (made in mainland Europe) and not the UK-manufactured timber ones. I fell foul of this a few years ago and had to cancel the order and go elsewhere (and delay the whole project still ;-( ). IIRC lead times were something like 5 months for alu clad and 2 for timber (but check with AB as the relative times may well have changed). Again, IIRC, the section was pretty skinny compared to the GBF (now 21 Degrees) wins I went for instead. May have required some head-scratching with IWI/EWI returns.
  3.  
    Well AB they guarantee 8 week lead time on the alu-clad:

    8 weeks lead time (from date of sign off – excluding annual shutdown period in the summer)
    One to one service with project coordinators
    32mm double glazed units (1.4 U-Val) average
    47mm Triple glazed units (0.8 U-Val) average
    Quick quotation turnaround time – usually within 24/48hrs
    Free assisted site survey by professional dedicated Allan Brothers staff

    I asked them about window makeup as Nordan is 4-16-4-16-4 and they advised their glass is 4-18-3-18-4 or could be configured as 4-20-3-16-4 if required

    AB have said their windows are made in Denmark

    I guess I'll need to revisit prices with both
  4.  
    Hi VE, obviously things have improved significantly since May 2022, when they wrote:

    ''Nick before I process this any further I need to make you aware that lead time is in the region of 14 to 15 weeks at present.
    The 8-10 week lead time you refer to is for U.K manufactured products, your order would be produced in Denmark.

    Can you firstly let me know if 15 weeks is acceptable as there is no improvement on this unfortunately due to volume of orders
    And also backlog associated with materials procurement issues.''

    I recall the prices being significantly lower than GBF all-timber Performance range. It was disappointing not being able to try them, but at that time the lead-time was far too long.
    •  
      CommentAuthorfostertom
    • CommentTimeJul 6th 2026 edited
     
    There's a pitfall- 'lead time' begins to run from when every last detail of the order is clarified and agreed - which can take several to-and-fro's with marked lack of urgency - weeks if not months (I'm talking otherwise-excellent-VFM Russell Timbertech here).