Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.

The AECB accepts no responsibility or liability for any errors or omissions in the content of this site. Views given in posts are not necessarily the views of the AECB.



    • CommentAuthorCWatters
    • CommentTimeJul 21st 2011 edited
     
    Does a ground mounted PV array qualify for the "retrofit" or "new build" FIT rate? Location would be in what is currently a paddock. I'm aware planning permission would be required.
    •  
      CommentAuthorDamonHD
    • CommentTimeJul 21st 2011
     
    Ground mount has its own (not very good) tariff.

    Rgds

    Damon
    •  
      CommentAuthorted
    • CommentTimeJul 21st 2011
     
    I think you are refering to 'stand-alone' Damon, but that is for panels that are not linked (electrically) to a building supply but, such as a solar farm, link directly to the grid.

    Ground-mounted in the garden/grounds of a house would be retrofit unless they were installed at the same time as the house was actually being built.
    •  
      CommentAuthorDamonHD
    • CommentTimeJul 21st 2011
     
    That's not my understanding, Ted, for when I considered just such a thing (for the grounds of a listed building, out of sight), but if I disagree with you then I'm probably wrong!

    Rgds

    Damon
    •  
      CommentAuthorted
    • CommentTimeJul 21st 2011
     
    The definition, such as it is, is in the tariff table in the Standard Conditions document:

    "Stand-alone (autonomous) solar photovoltaic (not attached to a building and not wired to provide electricity to an occupied building)"

    http://www.decc.gov.uk/assets/decc/what%20we%20do/uk%20energy%20supply/energy%20mix/renewable%20energy/policy/fits/1_20100331172153_e_@@_fitlicencemodification.pdf
    •  
      CommentAuthorDamonHD
    • CommentTimeJul 21st 2011
     
    OK, you seem to indeed be right.

    Possibly I'm confusing myself since we also had the opportunity to plonk panels in the middle of a field...

    Rgds

    Damon
    • CommentAuthorCWatters
    • CommentTimeJul 21st 2011
     
    Thanks. looks like I would qualify for the top rate.
    • CommentAuthorcrt
    • CommentTimeAug 1st 2011
     
    We've just put 3.92kw of Sharp panels on a ground mounted frame, 80m from the house, connected to the grid through the house system, it's designated "Non-standalone" and we are registered for, and will shortly be in receipt of, the higher rate domestic tariff. It needed full planning permission but this was received without any fuss through the online planning portal. Installation cost was reduced by being on the ground, but this was mostly offset by the additional cost of the long connection cable.
    • CommentAuthorCWatters
    • CommentTimeAug 1st 2011
     
    Thanks for that.
Add your comments

    Username Password
  • Format comments as
 
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press