Home  5  Books  5  GBEzine  5  News  5  HelpDesk  5  Register  5  GreenBuilding.co.uk
Not signed in (Sign In)

Categories



Green Building Bible, Fourth Edition
Green Building Bible, fourth edition (both books)
These two books are the perfect starting place to help you get to grips with one of the most vitally important aspects of our society - our homes and living environment.

PLEASE NOTE: A download link for Volume 1 will be sent to you by email and Volume 2 will be sent to you by post as a book.

Buy individually or both books together. Delivery is free!


powered by Surfing Waves




Vanilla 1.0.3 is a product of Lussumo. More Information: Documentation, Community Support.

Welcome to new Forum Visitors
Join the forum now and benefit from discussions with thousands of other green building fans and discounts on Green Building Press publications: Apply now.

The AECB accepts no responsibility or liability for any errors or omissions in the content of this site. Views given in posts are not necessarily the views of the AECB.



    • CommentAuthorwindyboy
    • CommentTimeNov 30th 2011
     
    To Ted and others,
    For my imminent turbine install should I insist that Western Power (my DNO) charge me 5% VAT on the transformer upgrade (25 kva upgraded to a 50kva) rather than 20% as this is a domestic installation next to our primary residence for a max turbine size of 15 KW. Looking on HM Rev and Customs website it does seem to say that "any ancillary works associated with the install will be at the reduced rate of 5%". Surely an upgraded transformer constitutes ancillary works ! This is important to non VAT registered individuals who of course cannot claim the VAT back.
    If anybody has had a transformer upgrade as above I would like to know what rate of VAT was paid.As always thanks in anticipation guys !! Windyboy.:confused:
    • CommentAuthorowlman
    • CommentTimeNov 30th 2011
     
    If the upgrade was a necessary part of the renewable install then I would guess it's lumped in with all the rest of the equipment and labour. If the install was done by for e.g. an acredited installer then I would pass the bill onto him and let him do the reduction on his final account to you. That way the transformer is just another bit of equipment along with the rest. I think you may have difficulty getting the supplier i.e. Western Power to do the reduction.
    •  
      CommentAuthornigel
    • CommentTimeNov 30th 2011
     
    If the DNO will not play ball get them to invoice the turbine supplier who can then claim the vat back and invoice you at 5% for all of the work.
    • CommentAuthorwindy lamb
    • CommentTimeNov 30th 2011
     
    Not sure I'd go with Owlman on this one. First negotiate with the Western Power Office, I found them very helpful and flexible BUT not sure the 5% rate will apply. It didn't when we first went on the grid as a domestic new build, VAT@ 17.5%, and a subsequent upgrade to 3 phase @20%VAT- but that was for a farm business. The lady in accounts was pretty clued up, 01559 382780 ( my area office was Llanfyangel-ar-arth) - don't bother speaking to the Plymouth accounts head office, it's the local staff you need to get.
    Regards
    WL
    • CommentAuthorEd Davies
    • CommentTimeNov 30th 2011
     
    Posted By: windy lambIt didn't when we first went on the grid as a domestic new build, VAT@ 17.5%,


    Weren't you able to include that in your VAT reclaim? I'm a bit surprised it wouldn't therefore eventually be 0% VAT.

    ...and a subsequent upgrade to 3 phase @20%VAT- but that was for a farm business.


    But if that was not for MCS approved generation then that's to be expected and not relevant here, is it?
    • CommentAuthorCWatters
    • CommentTimeNov 30th 2011 edited
     
    Posted By: owlmanIf the upgrade was a necessary part of the renewable install then I would guess it's lumped in with all the rest of the equipment and labour. If the install was done by for e.g. an acredited installer then I would pass the bill onto him and let him do the reduction on his final account to you. That way the transformer is just another bit of equipment along with the rest. I think you may have difficulty getting the supplier i.e. Western Power to do the reduction.


    My understanding is that VAT must always be collected at the correct rate and that VAT which is overcharged by a supplier can't be reclaimed from the VAT man. So I'd suggest it should be sorted by getting Western Power to requote at the correct rate. Refer them to the relevant HRMC guide.
    • CommentAuthorCWatters
    • CommentTimeNov 30th 2011
     
    Posted By: windy lambNot sure I'd go with Owlman on this one. First negotiate with the Western Power Office, I found them very helpful and flexible BUT not sure the 5% rate will apply. It didn't when we first went on the grid as a domestic new build, VAT@ 17.5%....


    I believe it should have been zero rated.

    My water co wanted to charge me VAT for a diversion and I had to argue with them that it should be zero rated. Eventually I showed them the relevant section of Vat Notice 708 and persuaded them to contact HMRC. Eventually got a new quote.
    • CommentAuthorCWatters
    • CommentTimeNov 30th 2011
     
    Windyboy - I would give the VAT help line a call. Ask for a call reference number. Explain why you think it should be 5% and if they agree give the call number to Western Power and ask them to requote.
    • CommentAuthorGavin_A
    • CommentTimeNov 30th 2011
     
    AFAIK western power can't legally charge 5% vat on this work.

    you need to persuade your installer to include western powers works as part of the overall installation contract, then your installer will charge you 5% vat on the entire job and reclaim the difference of the vat from western powers invoice from the HMRC.
    • CommentAuthorowlman
    • CommentTimeDec 1st 2011 edited
     
    Posted By: CWatters
    My understanding is that VAT must always be collected at the correct rate and that VAT which is overcharged by a supplier can't be reclaimed from the VAT man. So I'd suggest it should be sorted by getting Western Power to requote at the correct rate.

    Except that renewables are VAT rated at 5%. The hardware supplier sells them to the installer at 20% and the accredited installer makes the adjustment on his final invoice to the client. In this case it seems to me that Western Power are simply a supplier like any other, and as I and Gavin said, I doubt that they, (WP), have the remit to charge a lower VAT rate in this instance
  1.  
    For those of you who are interested (Ed Davies);
    My initial connection to the grid was charged at VAT 17.5%, reclaimed from HMRC under new build scheme. VAT still PAID at 17.5% but reclaimed.

    Upgrade to 3 phase was for wind turbine, charged at VAT 20% by Western Power, reclaimed by farm business from HMRC. VAT still paid at 20% before reclaim.
    In both cases VAT was due and was paid. Reclaiming the VAT is a separate thing.:cool:
    • CommentAuthordbj
    • CommentTimeDec 1st 2011
     
    I had transformer upgrade from 16to 50kVa for addition of 3.9 kw pv's on top of 6kw wind turbine.I tried for 5% vat ( we can't claim it back). Western Power said they checked it out with Vat people but we had to pay the (then) 17 .5%. Worth a try though, they may have mellowed since then!
    • CommentAuthorCWatters
    • CommentTimeDec 3rd 2011 edited
     
    Posted By: owlmanPosted By: CWatters
    My understanding is that VAT must always be collected at the correct rate and that VAT which is overcharged by a supplier can't be reclaimed from the VAT man. So I'd suggest it should be sorted by getting Western Power to requote at the correct rate.

    Except that renewables are VAT rated at 5%. The hardware supplier sells them to the installer at 20% and the accredited installer makes the adjustment on his final invoice to the client. In this case it seems to me that Western Power are simply a supplier like any other, and as I and Gavin said, I doubt that they, (WP), have the remit to charge a lower VAT rate in this instance


    Looks like I was wrong. The key appears to be that renewables on their own are standard rated, they only qualify for reduced rating if sold inclusive of installation. That's different to the VAT secheme for new build houses.
Add your comments

    Username Password
  • Format comments as
 
   
The Ecobuilding Buzz
Site Map    |   Home    |   View Cart    |   Pressroom   |   Business   |   Links   
Logout    

© Green Building Press